Discover all projects managed by W&K within the battery manufacturing process by clicking on the graphic, or navigate using the step table.
Our
References
Steps
Raw Material & Slurry Preparation
Dry dosing
Project Location:
- Germany
Duration:
- 2 Months
Services:
- Dosing & Mixing (Slurry Preparation)
- Vacuum Degassing of Slurry
Processing plant
Project Location:
- France
Duration:
- 2 Months
Services:
- Dosing & Mixing (Slurry Preparation)
- Vacuum Degassing of Slurry
Battery Factory
Project Location:
- Germany
Duration:
- 1 Year 7 Months
Services:
- Dosing & Mixing (Slurry Preparation)
- Vacuum Degassing of Slurry
Anode and cathode manufacturing
Project Location:
- USA
Duration:
- 1 Year 2 Months
Services:
- Dosing & Mixing (Slurry Preparation)
- Vacuum Degassing of Slurry
Battery Factory
Project Location:
- Germany
Duration:
- 4 Months
Services:
- Dosing & Mixing (Slurry Preparation)
- Vacuum Degassing of Slurry
Slurry System
Project Location:
- USA
Duration:
- 5 Months
Services:
- Dosing & Mixing (Slurry Preparation)
- Vacuum Degassing of Slurry
Installation & Assembly
Project Location:
- Germany
Duration:
- 2 Months
Services:
- Dosing & Mixing (Slurry Preparation)
- Vacuum Degassing of Slurry
Anode and cathode manufacturing
Project Location:
- Germany
Duration:
- 1 Year 8 Months
Services:
- Dosing & Mixing (Slurry Preparation)
- Vacuum Degassing of Slurry
Coating & Drying Line
Coating plant
Project Location:
- Germany
Duration:
- 2 Months
Services:
- Coating (Slot-Die/Doctor Blade)
- Drying (Multi-zone oven)
- Sometimes directly integrated with inline calender
Coating line
Project Location:
- USA
Duration:
- 10 Months
Services:
- Coating (Slot-Die/Doctor Blade)
- Drying (Multi-zone oven)
- Sometimes directly integrated with inline calender
Calendering
Eletrical rewiring
Project Location:
- Germany
Duration:
- 2 Months
Services:
- Densification (Calendering / Pressing)
Mechanical instalation support
Project Location:
- Germany
Duration:
- 1 Month
Services:
- Densification (Calendering / Pressing)
Mechanical instalation support
Project Location:
- USA
Duration:
- 10 Months
Services:
- Densification (Calendering / Pressing)
Slitting & Notching
Electrical power installation
Project Location:
- Germany
Duration:
- 3 Months
Services:
- Slitting - Notching
No projects available for this step.
Electrode Welding & Housing Assembly
Installation & Assembly
Project Location:
- Germany
Duration:
- 2 Months
Services:
- Tab Welding (Ultrasonic/Laser)
- Insertion into Housing & Enclosure
Electrolyte Filling & Sealing Unit
Installation & Assembly
Project Location:
- Germany
Duration:
- 3 Months
Services:
- Electrolyte Filling (Dosing, Vacuum)
- Sealing (Pouch-Heat-Seal, Prismatic-Laser)
No projects available for this step.
End-of-Line Testing & Sorting
Dismantling & Rewiring
Project Location:
- Germany
Duration:
- 2 Months
Services:
- Capacity Measurement
- Impedance Measurement
- Sorting into Quality Classes
Module & Pack Assembly Line
Disassembly and reassembly
Project Location:
- Germany
Duration:
- 8 Months
Services:
- Cell Feeding - Busbar Welding
- Fixation & Compression
- Sensor/BMS Integration
Disassembly and reassembly
Project Location:
- Germany
Duration:
- 8 Months
Services:
- Module Installation
- Integration of Cooling/Mechanical Parts
- Final Assembly & Housing
- End-of-Line Test